Improving Production Efficiency of NC-212 Aircraft Outer Wing Assembly Using Value Stream Mapping and Kaizen Approach

Authors

  • Dwi Adi Purnama Department of Industrial Engineering, Universitas Islam Indonesia, Yogyakarta, 55584, Indonesia
  • Diyah Dwi Nugraheni Department of Textile Engineering, Universitas Islam Indonesia, Yogyakarta 55584, Indonesia

DOI:

https://doi.org/10.12928/si.v24i2.606

Keywords:

Aerospace manufacturing, Kaizen, Manpower balancing, Value stream mapping, Wing subassembly

Abstract

Manual aircraft wing assembly is characterized by long lead times, process variability, and waste that reduce production efficiency. This study aims to improve the NC-212 Outer Wing Left-Hand (LH) assembly process by applying lean manufacturing through Value Stream Mapping (VSM), root-cause analysis, and Kaizen-based improvements. Primary data were collected through direct observations, time studies, and interviews across 12 assembly stations. The current-state analysis identified waiting due to pending parts, unnecessary transportation, defects, and manpower imbalance as the dominant sources of waste. Based on Five-Whys and 5W+1H analyses, improvement strategies and takt-time-based workforce allocation were developed to optimize production flow. The proposed future state reduced assembly lead time from 75 to 59 working days (21.3%) and increased average labor utilization to 96.16% through workload balancing and reduced idle time. The main contribution of this study is the application of VSM-based lean improvement integrated with takt-time-based manpower scheduling for a high-mix, low-volume aerospace assembly environment. The proposed framework provides practical guidance for improving workflow synchronization and supporting continuous improvement in aircraft manufacturing systems.

References

Agustin, M. D., & Ernawati, D. (2025). Reducing Waste in the Delivery System through Lean Distribution: Implications for Social Commerce Logistics. Journal of Social Commerce. https://celebesscholarpg.com/index.php/jommerce/article/view/156

Ahmad, R., Amin, R. F. M., & Mustafa, S. A. (2022). Value stream mapping with lean thinking model for effective non-value added identification, evaluation and solution processes. Operations Management Research, 15(3–4), 1490–1509. https://doi.org/10.1007/s12063-022-00265-9

Alfiansyah, R., & Kurniati, N. (2018). Identifikasi waste dengan metode waste assessment model dalam penerapan lean manufacturing untuk perbaikan proses produksi (studi kasus pada proses Pada Proses Produksi Sarung Tangan). In Jurnal Teknik ITS. https://doi.org/10.12962/j23373539.v7i1.28858

Amrani, A., & Ducq, Y. (2020). Lean practices implementation in aerospace based on sector characteristics: methodology and case study. Production Planning & Control, 31(16), 1313–1335. https://doi.org/10.1080/09537287.2019.1706197

Andreadis, E., Garza-Reyes, J. A., & Kumar, V. (2017). Towards a conceptual framework for value stream mapping (VSM) implementation: an investigation of managerial factors. International Journal of Production Research, 55(23), 7073–7095. https://doi.org/10.1080/00207543.2017.1347302

Aucasime-Gonzales, P., Tremolada-Cruz, S., P. Chavez-Soriano, F. Dominguez, and & C. Raymundo. (2020). Waste elimination model based on lean manufacturing and lean maintenance to increase efficiency in the manufacturing industry. IOP Conference Series: Materials Science and Engineering. https://doi.org/10.1088/1757-899X/999/1/012013

Ayough, A., Zandieh, M., & Farhadi, F. (2020). Balancing, sequencing, and job rotation scheduling of a U-shaped lean cell with dynamic operator performance. Computers & Industrial Engineering, 143, 106363. https://doi.org/10.1016/j.cie.2020.106363

Basiru, J. O., Ejiofor, C. L., Onukwulu, E. C., & Attah, R. U. (2023). Adopting lean management principles in procurement: A conceptual model for improving cost-efficiency and process flow. In Iconic Research and Engineering Journals.

Bizuneh, B., & Omer, R. (2024). Lean waste prioritisation and reduction in the apparel industry: application of waste assessment model and value stream mapping. Cogent Engineering, 11(1). https://doi.org/10.1080/23311916.2024.2341538

Borsato P. J. da M. O., Ignacio, A. A. V., & Coelho, O. (2022). An integer programming mathematical model with line balancing and scheduling for standard work optimization: A realistic application to aircraft engines assembly lines. Computers & Industrial Engineering, 173, 108652. https://doi.org/10.1016/j.cie.2022.108652

Carvalho, C. P., Carvalho, D. S., & Silva, M. B. (2019). Value stream mapping as a lean manufacturing tool: A new account approach for cost saving in a textile company. International Journal of Production Management and Engineering, 7(1), 1. https://doi.org/10.4995/ijpme.2019.8607

Chaudhary, A., Singh, A. K., & Meena, M. L. (2020). Productivity improvement of an electrical appliance industry by implementing lean manufacturing tools and a low-cost intervention (a case study). International Journal of Productivity and Quality Management, 31(3), 390. https://doi.org/10.1504/IJPQM.2020.110942

Damacharla, N. (2022). Minimization of Non-Value-Added Activities in an Aerospace Industry. International Journal for Research in Applied Science and Engineering Technology, 10(6), 1151–1156. https://doi.org/10.22214/ijraset.2022.43583

Diaz, I. C., Jin, Y., & Ares, E. (2017). Cycle time study of wing spar assembly on aircraft factory. Procedia Manufacturing, 13, 1019–1025. https://doi.org/10.1016/j.promfg.2017.09.107

Dotoli, M., Fanti, M. P., Rotunno, G., & Ukovich, W. (2011). A lean manufacturing procedure using value stream mapping and the analytic hierarchy process. 2011 IEEE International Conference on Systems, Man, and Cybernetics. https://ieeexplore.ieee.org/abstract/document/6083860/

Forno, A. J. D., Pereira, F. A., Forcellini, F. A., & Kipper, L. M. (2014). Value Stream Mapping: a study about the problems and challenges found in the literature from the past 15 years about application of Lean tools. The International Journal of Advanced Manufacturing Technology, 72(5–8), 779–790. https://doi.org/10.1007/s00170-014-5712-z

Fortuny-Santos, J., Ruiz-de-Arbulo-López, P., Cuatrecasas-Arbós, L., & Fortuny-Profitós, J. (2020). Balancing Workload and Workforce Capacity in Lean Management: Application to Multi-Model Assembly Lines. Applied Sciences, 10(24), 8829. https://doi.org/10.3390/app10248829

Garre, P., Nikhil Bharadwaj, V. V. S., Shiva Shashank, P., Harish, M., & Sai Dheeraj, M. (2017). Applying lean in aerospace manufacturing. Materials Today: Proceedings, 4(8), 8439–8446. https://doi.org/10.1016/j.matpr.2017.07.189

Gopi, S., Suresh, A., & John Sathya, A. (2020). Value stream mapping & Manufacturing process design for elements in an auto-ancillary unit – A case study. Materials Today: Proceedings, 22, 2839–2848. https://doi.org/10.1016/j.matpr.2020.03.416

Kaukonen, S. (2025). Implementing lean supply chain management principles to enhance supply chain efficiency: a case study. lutpub.lut.fi. https://lutpub.lut.fi/handle/10024/169871

Kundgol, S., Petkar, P., & Gaitonde, V. N. (2021). Implementation of value stream mapping (VSM) upgrading process and productivity in aerospace manufacturing industry. Materials Today: Proceedings, 46, 4640–4646. https://doi.org/10.1016/j.matpr.2020.10.282

Lee, P. F., Khan, N. A. A., & Muhammad, N. A. (2025). Lean implementation in service sector: a case study of waste elimination in Malaysian customs administration. In International Journal of Lean Six Sigma. https://doi.org/10.1108/IJLSS-12-2023-0227

Liu, Q., & Yang, H. (2020). Incorporating Variability in Lean Manufacturing: A Fuzzy Value Stream Mapping Approach. Mathematical Problems in Engineering, 2020, 1–17. https://doi.org/10.1155/2020/1347054

Logesh, B., & Balaji, M. (2021). Experimental Investigations to Deploy Green Manufacturing through Reduction of Waste Using Lean Tools in Electrical Components Manufacturing Company. International Journal of Precision Engineering and Manufacturing-Green Technology, 8(2), 365–374. https://doi.org/10.1007/s40684-020-00216-4

Purnama, D. A., Subagyo, & Masruroh, N. A. (2023). Online data-driven concurrent product-process-supply chain design in the early stage of new product development. Journal of Open Innovation: Technology, Market, and Complexity, 9(3), 100093. https://doi.org/10.1016/j.joitmc.2023.100093

Rahman, A. (2021). Penerapan lean manufacturing untuk meminimalkan waste dengan menggunakan metode VSM dan WAM pada PT XYZ. Prosiding Seminar Nasional Penelitian LPPM UMJ. https://jurnal.umj.ac.id/index.php/semnaslit/article/view/10595

Sasidharan T.P. (2025). Critical Studies on Cycle Time Reduction Using Lean Tools of Aerospace Components. Journal of Information Systems Engineering and Management, 10(50s), 676–685. https://doi.org/10.52783/jisem.v10i50s.10347

Seth, D., Seth, N., & Dhariwal, P. (2017). Application of value stream mapping (VSM) for lean and cycle time reduction in complex production environments: a case study. Production Planning & Control, 28(5), 398–419. https://doi.org/10.1080/09537287.2017.1300352

Statista. (2025). Manufacturing sector in Indonesia - statistics & facts. Statista. Statista. https://www.statista.com/topics/9307/manufacturing-industry-in-indonesia/

Wang, C. N., Vo, T., Hsu, H. P., Chung, Y. C., & Nhat-Luong, N. (2024). Improving processing efficiency through workflow process reengineering, simulation and value stream mapping: a case study of business process reengineering. In Business Process Management Journal. emerald.com. https://doi.org/10.1108/BPMJ-11-2023-0869

Downloads

Published

2026-10-28

How to Cite

Improving Production Efficiency of NC-212 Aircraft Outer Wing Assembly Using Value Stream Mapping and Kaizen Approach. (2026). Spektrum Industri, 24(2), 471-493. https://doi.org/10.12928/si.v24i2.606